What to Include in a CNC Machining Inquiry

Complete project information helps CNC Works AI review the part and prepare a quotation. Share the drawing or model through an agreed channel after submitting an inquiry.

Part Definition

Provide a current 2D drawing or 3D model, drawing revision, critical dimensions, and any functional interfaces that affect fit or assembly.

Material and Finish

Specify the requested material grade, stock form if known, surface finish, and any secondary operation required by the drawing.

Quantity and Schedule

Include prototype or production quantity and the requested schedule. Manufacturing lead time is reviewed for the material, process, finish, and quantity.

Inspection Scope

Identify critical features, acceptance criteria, and inspection or documentation records required for the project.

How a Project Is Reviewed

The review follows the supplied drawing and agreed requirements. Process feasibility, quotation scope, and production timing are confirmed for the individual part.

  1. 1. Submit an inquiry

    Share contact details, part description, quantity, and the requested process or application.

  2. 2. Provide drawing details

    Send the drawing or 3D model through the channel agreed during follow-up, including revision and critical requirements.

  3. 3. Review the project scope

    Material, machining approach, finishing, inspection, and documentation requirements are checked against the part definition.

  4. 4. Receive a quotation

    A quotation is generally prepared within two business days after complete drawings and project requirements are received. Any missing information is clarified as needed.

  5. 5. Confirm production planning

    Production lead time and inspection scope are confirmed for the specific material, process, finish, and quantity before an order is accepted.

Questions Before Requesting a Quote

How long does a CNC machining quotation take?

A quotation is generally prepared within two business days after complete drawings and project requirements are received. Timing may depend on whether the information is complete.

Can I upload a CAD file through the inquiry form?

The current contact form does not accept file attachments. Submit the inquiry first, then share drawing files through an agreed channel during follow-up.

Are tolerances and inspection reports included by default?

Tolerances follow the drawing. Inspection methods, acceptance criteria, and requested records are reviewed and agreed as part of the project scope.

How is manufacturing lead time set?

Lead time is confirmed for the specific material, machining process, finish, and quantity.